500mm Lead Screw And Nut Set In 304 Stainless Steel With 8mm Diameter And 2mm Lead Pitch High Speed Durable Linear Motion Component For CNC Machines And 3D Printers Ready For Precise Positioning And Reliable Long Term Use
Title
Regular price
$29.99
Sale price$49.99you save $20.00
SKU: 500MM-LONG-LEAD-SCREW-NUT
UPC: 00193019147047
UPC: 00193019147047
500mm Lead Screw and Nut Assembly, 8mm dia, 2mm lead
✔️ 500mm length, 8mm diam, 2mm lead, 304 stainless, 1 pack
✔️ 500mm length, 8mm diam, 2mm lead, 304 stainless, 1 pack
This 500mm leadscrew and nut combo is built from 304 stainless steel, delivering smooth, precise linear motion for machinery, CNC, 3D printers, and automation projects. It’s designed to withstand high-speed operation and demanding use.
✅ Length: 500 mm (19.69 in)
✅ Diameter: 8 mm (0.315 in)
✅ Lead: 2 mm (0.079 in)
✅ Material: 304 stainless steel
✅ Includes: 1 lead screw + 1 nut
✅ Use: suited for high-speed operation and durability
💡 What is a lead screw and nut used for in linear motion systems?
Lead screws convert rotational motion into precise, controllable linear travel, handy for setups that require accurate positioning.
- handy for CNC machines, 3D printers, and automation projects - provides smooth, backlash-controlled movement when paired with a compatible nut - stainless steel construction offers durability in industrial environments - ideal for hobbyists and light-duty production installations
Share