4WD Front Wheel Hub Bearing Assembly Fits Lexus GX460 GX470, Toyota 4Runner, FJ Cruiser, And Tacoma 2003 To 2021 With WBS Heavy Duty DIY Friendly Bolt On Replacement Kit Included

Regular price $199.99 Sale price$300.00you save $100.01
SKU: VXB08RRHBJ8B
Product ID: 1130-7417
UPC:





Heavy-Duty 4WD Front Wheel Hub Bearing Kit (Single)
✔️ Front hub fits GX460/GX470, 4Runner, FJ Cruiser, Tacoma - 1-pack

This wheel hub bearing assembly is a heavy-duty bolt-on replacement built for 4WD trucks and SUVs. It's designed to restore wheel rotation accuracy, steering feel, and load support on front axles for models like GX460, GX470, 4Runner, FJ Cruiser, and Tacoma.

✅ Compatible with 2010-2021 GX460, 2003-2009 GX470, 2003-2021 4Runner, 2007-2014 FJ Cruiser, 2005-2021 Tacoma
✅ Front position only, left or right side on 4WD models
✅ OEM-quality materials tested for reliability and durability
✅ DIY-friendly bolt-on kit for easy installation
✅ Includes 3-year aftermarket warranty for protection

💡 What is a front wheel hub bearing assembly used for in 4WD vehicles? This handy component provides wheel load support and smooth rotation, helping with steering precision and braking stability. - Supports wheel load and hub alignment - Maintains smooth rotation and reduces axle wear - Ensures reliable ABS signals for braking safety - DIY-friendly bolt-on installation for simple maintenance