25 Gallon ATV UTV Spot Sprayer With 2.2 GPM 12V Diaphragm Pump, Eco Series Spray Gun, Adjustable Nozzle, 29 Inch Wand, 15 Foot Hose, UV Resistant Poly Tank, Perfect For Lawn Care, Yard Work, And Light Agricultural Spraying

Regular price $404.88 Sale price$650.00you save $245.12
Product ID: 1136-8009
UPC:





25-Gallon ATV UTV Sprayer with 2.2 GPM Diaphragm Pump
✔️ 2.2 GPM @ 100 PSI SHFLO diaphragm pump; 29 in wand; 15 ft hose

The 25-gallon sprayer is designed to mount on ATVs, UTVs, or in trailer beds, delivering herbicides, pesticides, and liquid fertilizers with controlled spray patterns for lawns, pastures, and larger properties.

✅ 25-gallon UV-resistant polyethylene tank with molded-in gallon markers
✅ SHFLO 12V diaphragm pump delivers 2.2 GPM at up to 100 PSI
✅ Eco-Series spray gun with adjustable nozzle for narrow stream or wide fan
✅ 29 in wand (737 mm) and 15 ft hose (4572 mm) for reach
✅ Universal mounting on ATV racks, UTV beds, or trailers
✅ Made in USA for durability and field-ready performance

💡 What is a spot sprayer best used for in lawn care and light farming?

Handy for precise, targeted chemical placement that reduces waste and drift.

  • Targeted weed control along fences, edges, and driveways
  • Precise treatment on trees, shrubs, and small plots
  • Compatible with liquid fertilizers, pesticides, and herbicides
  • Easy mobility on ATVs/UTVs for fast field coverage